Surface Transportation Authorization
Member Designated Projects For Consideration in Surface Transportation Authorization Legislation
Federal highway and public transportation programs are funded through multi-year surface transportation authorization acts. The current surface transportation program authorization expires on September 30, 2021.
To ensure oversight, transparency, and accountability, Congresswoman Sewell is publicly posting the Member Designated Projected requested to the House Transportation and Infrastructure Committee.
- Choctaw County - Resurfacing on US 84 - NH-0012(575) 100072528
- Preventative Maintenance
- Federal Cost: $1,616,000.00
- Total Cost: $2,020,000.00
- Project Sponsor: ALDOT
- Location: SR-12 from SR-17 to 1.6 miles East of CR-6
- Dallas County – Bridge Replacement on SR-14 - BR-0014() 100061670
- Bridge Replacement
- Federal Cost: $6,239,938.87
- Total Cost: $7,799,923.59
- Project Sponsor: ALDOT
- Location: SR-14 at Blue Girth Swamp (Bin 1556 and 1557)
- Greene and Pickens County – Bridge Replacement on SR-14 over the Sipsey River - BR-0014() 100070681
- Bridge Replacement
- Federal Cost: $3,296,963.20
- Total Cost: $4,121,204
- Project Sponsor: ALDOT
- Location: SR-14 over the Sipsey River
- Jefferson County – Streetscape along Civil Rights District Freedom Trail – CMAQ – 3717() 100067028
- Streetscape Project
- Federal Cost: $2,000,000.00
- Total Cost: $3,000,000.00
- Project Sponsor: City of Birmingham DOT
- Location: 4th Ave N. from 15th to 19th St. N., 5th Ave N. from 11th St. N. to 1800 Block, 6th/7th Ave N from 14th to 17th St. N., 15th/16th St. N. from 3rd Ave N. to 8th Aly N., 17th St. N. from 3rd Ave Aly N. to Rev Abr Woods Jr. Blvd, 18th St N. from 3rd to 4th Ave N.
- Jefferson County – Streetscape on Richard Arrington Jr. Boulevard – CMAQ-3718() 100072429
- Streetscape Project
- Federal Cost: $1,969,664
- Total Cost: $2,462,080
- Project Sponsor: City of Birmingham DOT
- Location: Richard Arrington Jr. Boulevard from 15th Ave. South to Valley Ave.
- Marengo County – Resurfacing on US-43 - NH-0013(619) 100073275
- Preventative Maintenance
- Federal Cost: $1,616,000.00
- Total Cost: $2,020,000.00
- Project Sponsor: ALDOT
- Location: SR-13 (US-43) from Oakley Ave to 12 Link Road
- Montgomery County – Bridge Replacement on CR-39 - STPMN-7701(602) 100055809
- Bridge Replacement
- Federal Cost: $2,339,717.12
- Total Cost: $2,924,646.40
- Project Sponsor: Montgomery Metro Planning Organization
- Location: CR-39 (Woodley Road) at White Slough and Tributary
- Wilcox County – Bridge Replacement on SR-5 - BR-0005(529) 100051325
- Bridge Replacement
- Federal Cost: $5,649,575.20
- Total Cost: $7,061,969.00
- Project Sponsor: ALDOT
- Location: SR-5 over Mud Creek